LM Infinite

Home  /  Services  /  Shop Renovation

Shop Renovation in Singapore

Retail fit-outs built to the mall’s handbook and the landlord’s deadline — shopfront, ceilings, lighting, flooring and display joinery, with the night access that centre work demands.

bizSAFE Star certification badge from the WSH Council
bizSAFE Star

Highest level awarded by the WSH Council

ISO 45001:2018 certified company badge
ISO 45001:2018

Occupational Health & Safety, certified by TNV

BCA
Registered Contractor

CR06 Interior Decoration & Finishing · Grade L1

2019
Established

Reg. No. 201902206D · $100,000 paid-up capital

Every certification above is current and independently verifiable — on the BCA Directory, with TNV, and with the WSH Council.

What’s included

Everything a retail unit needs

Shop renovation is retail fit-out: the shopfront and signage, the ceiling and lighting that make merchandise look right, flooring that survives traffic, display joinery and counters, and the power and data behind the till. Retailers take it on at a new lease, at a refit between concepts, or when a centre requires an upgrade at renewal. The job is shaped less by floor area than by the landlord’s fit-out handbook and the opening date written into the lease.

LM Infinite does retail work across Singapore with directly employed tradesmen and night access where the centre requires it. Mall fit-outs run to someone else’s calendar, so we programme backwards from your opening date and the landlord’s milestones rather than forwards from site start.

Office interior fit-out with lighting and carpentry installation in progress
How it works

From unit survey to opening day

1. Enquiry and unit survey

We survey the unit, check the shopfront line, the existing services and the condition the landlord handed it over in. The survey is free.

2. Fit-out handbook and submission

Centres issue a handbook covering approved materials, shopfront lines, lighting levels, hoarding and working hours. Our documentation goes to the landlord’s technical team before site access is granted.

3. Scope, programme and quote

Programmed backwards from your opening date, with the landlord’s milestones built in and night working priced openly.

4. Approvals and QP coordination

Where ceilings, sprinklers or shopfront changes affect fire safety, plans are lodged with SCDF by a Qualified Person. We build to the approved drawings.

5. Night works and hoarding

Hoarding goes up to the centre’s standard, and works run in the permitted overnight window with deliveries and lift access booked in advance.

6. Snagging, cleaning and opening

Snags closed, the unit cleaned and the hoarding struck in time for your opening rather than after it.

Budget

What drives the price of a shop fit-out

Retail pricing is set as much by the centre as by the unit. The handbook puts a floor under the specification before you have chosen anything.

A basic fit-out in a premium centre can cost more than a generous one in a strata unit, because the handbook sets the minimum. Night access and a tight opening date are the other two multipliers.

Singapore requirements

What a retail fit-out has to satisfy

Retail work answers to the landlord first and the agencies second — but both can stop you opening, and the landlord’s approval is the one that most often runs late.

The landlord’s fit-out handbook

Malls and managed buildings issue a handbook covering shopfront lines, permitted materials, lighting levels, hoarding, working hours, delivery routes and contractor insurance. Approval from the landlord’s technical team normally comes before site access — and it is the single most common cause of a late start.

Change of use (URA)

Changing between retail uses is often straightforward. Moving from retail to food and beverage crosses use classes and needs URA planning permission, so settle it before the lease rather than after.

Signage licensing (BCA)

Outdoor advertising signs and signboards are licensed by BCA, and for signs meeting certain criteria — including those exceeding 10 square metres — a Permit To Use is required before a licence is granted. Licences are not transferable, so a new operator needs a new application.

Fire safety (SCDF)

Where a fit-out alters sprinkler or detector layouts, compartmentation or escape routes, plans are lodged with SCDF by a Registered Architect or Professional Engineer before works start. Open shopfronts and ceiling changes are the usual triggers in retail.

Get the handbook before you get the design. Confirm signage criteria with BCA and use requirements with URA before anything is fabricated.

Why choose us

Why clients keep calling us back

Certified & registered

BCA Registered Firm, ISO 45001:2018 and bizSAFE Star. Safety and compliance are documented, not assumed.

Our own team

Directly employed tradesmen and our own vehicles — no subcontractor lottery on your job.

Fixed written quotes

Itemised before work starts. Nothing gets added to your bill without you approving it first.

Fast response

Most small jobs attended within 1–2 working days, with a free site visit for larger works.

Our work

Retail fit-out projects

Planning a shop fit-out?

One call is all it takes. Tell us what you need and we will arrange a free site visit anywhere in Singapore.

New retail units, refits between concepts and end-of-lease reinstatement, in centres and strata units across Singapore.

BCA Registered · ISO 45001:2018 · bizSAFE Star · Free site visit anywhere in Singapore

Prefer to write instead?
Questions

Shop Renovation FAQ

Mall fit-out windows are often two to four weeks of night works, and that is what the landlord’s programme assumes. Whether it is achievable depends on how early the design is approved — the build is rarely the bottleneck, the handbook approval is.

Yes. Most centres restrict fit-out to after trading hours, with delivery windows and lift access booked in advance. We programme around those windows rather than asking the centre to make exceptions for us.

The landlord’s technical team, against the fit-out handbook: shopfront line, materials, signage zone and lighting level. We prepare the contractor documentation they require and build to the approved design.

Outdoor signs and signboards are licensed by BCA, and larger signs — including those over 10 square metres — require a Permit To Use before the licence is granted. Licences are not transferable between operators. Confirm the current criteria with BCA before anything is fabricated.

Yes, quoted against the reinstatement clause and the landlord’s handover standard — usually stripping back to bare shell, making good the services and removing signage.

Yes. Where a designer or a brand has produced the concept, we build to their drawings and handle the landlord-facing contractor requirements: insurance, method statements, permits and night access.

More from us

Other services we provide

Commercial kitchen with pendant lighting fitted out by LM Infinite

Restaurant Renovation Contractor

F&B fit-outs built for the licence: kitchen layout, grease trap, exhaust and front of house.

LM Infinite team carrying out an office interior fit-out in Singapore

Commercial Renovation

Showrooms, clinics, warehouses and service counters, phased around a live operation.

Office interior fit-out with lighting and carpentry installation in progress

Office Renovation

Partitions, ceilings, power and data, delivered around your trading hours.

Timber-lined interior with built-in joinery in a Singapore landed property

Carpentry & Built-in Cabinets

Display joinery, counters and back-of-house storage built to your drawings.

Electrician working on a distribution board during a Singapore renovation

Electrical & Lighting Services

Track lighting, power and point-of-sale provision by licensed electrical workers.

Outdoor timber decking substructure being installed by LM Infinite in Singapore

Flooring, Tiling & Ceiling

Retail flooring and suspended ceilings installed to the centre’s specification.

Scroll to Top